The Relationship Between Monitoring, Evaluation Methods, and the Achievement of a Rwandan Agricultural Project A Case of Radical Terraces Funded by USAID-HINGA WEZE Project in Nyabihu District (2018-2020)

Authors

  • Imanishimwe Marie Therese University of Kigali (UoK), School of Graduate Studies, P.O Box: 2611 Kigali, Rwanda.
  • Ndabananiye Gamariel University of Kigali (UoK), School of Graduate Studies, P.O Box: 2611 Kigali, Rwanda.
  • Mutabazi Placide Nkumba University, School of Postgraduate Studies and Research, P.O. Box 237, Entebbe Uganda.

Keywords:

Cost, Time, Quality, stakeholder engagement, Observation and estimation Planning, estimation methods, Observation and estimation resources, Observation and estimation Data

Abstract

This  study  focuses  on the evaluation on the relationship between Monitoring, Evaluation Methods, and the Achievement of a Rwandan Agricultural Project. The study aimed at finding out  whether the relationship between Monitoring, Evaluation Methods, and the Achievement of a Rwandan Agricultural Project were effective most especially in Radical Terraces funded by USAID-HINGA WEZE Project in Nyabihu District.  The design of this study was a quantitative method and correlative research design. Information was obtained from 112 populations (53.6% males to 46.4% females) who have a direct impact and different USAID-Hinga-Weze project stakeholders in Nyabihu district (staff at Kintobo sector, staff at Rurembo sector, village leaders or heads, staffs from District (Nyabihu) and staff’s managers and technicians of the project in the district) in addition to project beneficiaries in the same area. Data collection was done by using a questionnaire. Data analyses were made with the support of SPSS version 20. The study's analysis outputs given a moderately favorable association between the M&E plans, methods, resources, and data needed to ensure the efficient use of costs, time management, and quality project outputs for agricultural projects. the study findings have revealed that, free of charge, the project has terraced the plots of beneficiaries, supplied fertilizers, and other opportunities and these could be used for developing and improving their living conditions.

References

. Maylor, H., Brady, T., Cooke-Davies, T., & Hodgson, D. (2006). From projectification to programmification. International Journal of Project Management, 24(8), 663–674. https://doi.org/10.1016/j.ijproman.2006.09.014.

. Mutinda, bithi, V., & Kiruja, I. dr E. (2015). Role of M&E. International Journal of Innovative Development & Policy Studies, 3(3), 12–27. http://seahipaj.org/journals-ci/sept-2015/IJIDPS/full/IJIDPS-S-2-2015.pdf

. National Institute of Statstics of Rwanda. (2019). Seasonal Agricultural Survey 2019. 123.

. Rushema, E., Maniragaba, A., & Ndihokubwayo, L. (2020). The Impact of Land Degradation on Agricultural Productivity in Nyabihu District-Rwanda , A Case Study of Rugera Sector. 7, 49–63.

. Saraswathi Menon, Judith Karl, K. W. (2009). Handbookon Planning, Monitoring And Evaluating For Development Results. In United Nations Development Programme (Vol. 68, Issue 3). https://doi.org/10.1103/PhysRevC.68.034321

. Tengan, C., & Aigbavboa, C. (2017). Level of Stakeholder Engagement and Participation in M&E of Construction Projects in Ghana. Procedia Engineering, 196(June), 630–637. https://doi.org/10.1016/j.proeng.2017.08.051

. UNDP. (2015). Handbook on Monitoring and Evaluating for Results. In Berichte z. Symposium Flugzeugmessprogramm, veranstaltet v.d. DFVLR u.d. DGPF v. 29-31.8.1977 i.d. Techn. Univ. Hannover.

. Van Dooren, W., Bouckaert, G., & Halligan, J. (2010). Performance management in the public sector. Performance Management in the Public Sector, July 2014, 1–198. https://doi.org/10.4324/9780203030806

. DeWalt, D. A., Davis, T. C., Wallace, A. S., Seligman, H. K., Bryant-Shilliday, B., Arnold, C. L., Freburger, J., & Schillinger, D. (2009).

. Diane, M. (2018). Monitoring & Evaluation and Performance contracts in Rwanda local Government projects: Case of construction of modern markets in kicukiro District. June. http://erepository.mkuit.ac.rw/handle/123456789/5943

. Donovan, J. J., & Williams, K. J. (2003). 88(3), 379–390. https://doi.org/10.1037/0021-9010.88.3.379 Ibrahim Osman. (2002). Handbook for M&E. Evaluation, October, 1–163.

. Institute, P. M. (2000). A guide to the project management body of knowledge. In Newtown Square, Pennsylvania USA (Vol. 69, Issue 5). https://doi.org/10.1093/ajcp/69.5.475

. Jose, A. M. (2009). Sustainable Agricultural Development and Environment: Conflicts and Contradictions in the context of the Rwandan Agriculture. Rwanda Journal, 17(1), 106–129.

. Kayiranga, F. (2015). Monitoring , Evaluation ( M & E ) And The Successful Road Project Delivery In Rwanda A Case Study Of Kigali Special Economic Zone Roads Built By Npd - Contraco Ltd Felicien Kayiranga Mba / 0480 / 13 A Research Project Submitted in Partial Fulfillment of t. September.

Downloads

Published

2022-03-23

How to Cite

Imanishimwe Marie Therese, Ndabananiye Gamariel, & Placide , M. . (2022). The Relationship Between Monitoring, Evaluation Methods, and the Achievement of a Rwandan Agricultural Project A Case of Radical Terraces Funded by USAID-HINGA WEZE Project in Nyabihu District (2018-2020). International Journal of Natural Sciences: Current and Future Research Trends, 13(1), 22–29. Retrieved from https://ijnscfrtjournal.isrra.org/index.php/Natural_Sciences_Journal/article/view/1088